After five days of service and upgrade work on the Hubble Space Telescope (HST), the   STS-109 crew photographed the giant telescope returning to its normal routine. The   telescope was captured and secured on a work stand in Columbia's payload bay using   Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks   completing system upgrades to the HST. Included in those upgrades were: The   replacement of the solar array panels; replacement of the power control unit (PCU);   replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys   (ACS); and installation of the experimental cooling system for the Hubble's Near-  Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant   since January 1999 when its original coolant ran out. The Marshall Space Flight Center   had the responsibility for the design, development, and construction of the the HST,   which is the most complex and sensitive optical telescope ever made, to study the   cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing   mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in   NASA's Space Shuttle Program. n/a

Similar

After five days of service and upgrade work on the Hubble Space Telescope (HST), the STS-109 crew photographed the giant telescope returning to its normal routine. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near- Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program. n/a

description

Summary

After five days of service and upgrade work on the Hubble Space Telescope (HST), the STS-109 crew photographed the giant telescope returning to its normal routine. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near- Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1999
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

sts 109
sts 109